Moving Bins and Grain Dryer/ Lifting Leg System
This customer needed help moving and setting up a used dryer system and grain bins. After a few hours with a bin moving trailer, we had the bins in place. Then we brought our 35 ton boom truck and a truck with a lowboy trailer to move the grain dryer to the new site, and lift it into place. Later, we came back to site with our boom truck to assist a crew in the lifting and assembly of the leg system.
![IMG_1887](http://tarinenterprisesltd.ca/wp-content/uploads/2020/12/IMG_1887.jpg)
![IMG_3503](http://tarinenterprisesltd.ca/wp-content/uploads/2020/12/IMG_3503.jpg)