Stage 1
The first stage of this job consisted of our Freight division hauling a number of hoppers into the site where the job was to take place
![](http://tarinenterprisesltd.ca/wp-content/uploads/2017/05/IMG_4948-1.jpg)
Stage 2
The 20 ton picker was used to unload and place the hoppers on the customer’s bin pad
![](http://tarinenterprisesltd.ca/wp-content/uploads/2017/05/IMG_4975.jpg)
Stage 3
The bin crew retrofitted Westeel Rosco 19′ grain bins to 5,300 bushel capacity, and mounted them onto the hoppers
![](http://tarinenterprisesltd.ca/wp-content/uploads/2017/05/IMG_5035.jpg)
Stage 4
The crew also repaired some bins that had been blown over in a storm.
![](http://tarinenterprisesltd.ca/wp-content/uploads/2017/05/iphone-119-smaller.jpg)
Stage 5
Bins were moved in from numerous locations
Job Complete...
![](http://tarinenterprisesltd.ca/wp-content/uploads/2017/05/IMG_5732-Cropped-1.jpg)
Stage 6
Crew came back at a later date to drive anchors and tie down bins…
![](http://tarinenterprisesltd.ca/wp-content/uploads/2017/05/IMG_5730-Cropped-1.jpg)
Stage 7
…and replace old lids with new center ring adapters and lids