Stage 1
The first stage of this job consisted of our Freight division hauling a number of hoppers into the site where the job was to take place
Stage 2
The 20 ton picker was used to unload and place the hoppers on the customer’s bin pad
Stage 3
The bin crew retrofitted Westeel Rosco 19′ grain bins to 5,300 bushel capacity, and mounted them onto the hoppers
Stage 4
The crew also repaired some bins that had been blown over in a storm.
Stage 5
Bins were moved in from numerous locations
Job Complete...
Stage 6
Crew came back at a later date to drive anchors and tie down bins…
Stage 7
…and replace old lids with new center ring adapters and lids